When it's done, the four-block project will be able to drain 17,000 cubic metres of water per year from the roadway — as much water as approximately seven Olympic-sized swimming pools.
from CBC | Canada News https://ift.tt/Zzsn8K9
When it's done, the four-block project will be able to drain 17,000 cubic metres of water per year from the roadway — as much water as approximately seven Olympic-sized swimming pools.
0 comments:
Post a Comment